DTG Projects
Rejuvenation of Guildhall Square, Sandwich
Client: Aesir Construction
Eurotunnel – Various Locations & Various Projects
Client: The Channel Tunnel Group
A249 Bearsted Road Improvement Scheme
Client: Colas
Various Locations & Various Projects
Client: blu-3
Dover Western Docks Revival (DWDR)
Client: Knights Brown
Dover Fastrack
Client: Colas
New Polybitumen Plant – Thurrock
Client: PolyBitumens – Eurovia UK
Various sites around Dover Kent area
Various projects from the Dover area.
Victoria Road – Ashford
DTG carried out the kerbing – ducting – drainage – formation trim and block paving for a new permeable car park.
S278 Works – Britannia Road Rochester
Installing a new entrance for future housing project.
Medway City Estate
DTG installed a new 3 stage commercial vehicle wash down separator.
Household Waste Recycling Centre – Maidstone
DTG formed a new concrete slab & bunded retaining wall.
Arc Academy – London
DTG carried out work to form the FRC MUGA retaining wall & paving works.
Thames Tideway
DTG worked on various site locations on this project, carrying out ducting – FRC works – compound set up, and many other tasks.
Dunsbury Hill Farm – New Highway Development
This was another nice lengthy contract for DTG, where again we carried out ducting – kerbing & paving – river realignment works.
Accreditations
Certificates held within DTG
CSCS as a minimum industry standard
First Aid
All plant categories
SSSTS
SMSTS
Confined space entry
Slinger / Signaller
Banksman
NRSWA
Lift Supervisor
Temporary Works Supervisor
Contact Us
Registered Address:
63 High Street, Chislehurst, Kent BR7 9FA
Postal Address:
P.O. Box 66690, Leytonstone E11 9FA
Director:
Mr Henk Louw - 07812 146412
Senior Contracts Manager:
Mr John Hind MCIOB - FCMI - 07572 879728
Contracts Manager:
Mr Leigh Flockhart - 07808 232011
Works Manager – Sub Agent:
Mr Richard Darrall - 07860 165831
Email:
info@downtogroundworks.co.uk